Image New Scavenger Battery Boxes are ready. Check them out in our file section .

Machined Greeblies

AFR0J3D1
Moderator
Moderator
Posts: 24
Joined: Sun Nov 09, 2025 10:50 pm
Answers: 0

Re: Machined Greeblies

Post by AFR0J3D1 »

Do you have final pics?
jeanluc83
Rank 1
Rank 1
Posts: 9
Joined: Wed May 28, 2025 11:30 pm
Answers: 0

Re: Machined Greeblies

Post by jeanluc83 »

I don’t have anything finished per se. Right now, my R2 build consists of is a set of drives, ankles and some greebies. The center ankle will probably be my first finished part.

I started work on the ankle cylinders. The outer profiles are turned for all four of the cylinders and the centers have been milled out on two of them. I still need to drill and tap the mounting holes and mill the flats on the ends.

20260104_151236_resize_12.jpg
20260104_151236_resize_12.jpg (696.57 KiB) Viewed 144 times
20260104_113708_resize_30.jpg
20260104_113708_resize_30.jpg (525.73 KiB) Viewed 144 times

I’m following the CS-L specs for these. The difference between the CS-R and CS-L cylinders is very minimal. Some of the features are slightly easier for me to make following the CS-L dimensions. No one is ever going to be able to tell the difference anyway.
Post Reply